Relocation of the Sun Plaza Motel Sign
My job was to place the new pipe stubs out of the ground at 2 feet above grade and 5 feet below. I was also in charge
of all welding done once the sign was cut down and relocated using a crane service.

This is before we moved it at it's old location.

This is after we cut it off at the ground. You can see the new location.

This is during the move.

Lining it up with the new posts.

This is after all welding is done and the poles are painted.

This is after everything is done except for some neon the customer decided to change after we got the sign lit using
temporary power while waiting for the electricians to relocate the old power.
|